A fiberglass pool is built in a factory and arrives finished, so most of the work in your yard is digging the hole, setting the pool and connecting it. Here is what happens, in order, when Homery does a full installation.
1. Plans and permit
Before anyone digs, we prepare signed and sealed engineering plans and handle the building permit and city fees. This is the longest part of the job. It usually takes 40 to 60 days, depending on your city.
2. Excavation
We dig the hole, level the bottom and pour a concrete slab base for the pool to rest on.
3. Delivery and setting the pool
Your pool arrives finished from the factory. The shell is set in place and leveled. Crane service is part of a full installation when the job needs it.
4. Plumbing, electrical and equipment
- Plumbing: lines to the skimmer, return jets and main drains.
- Electrical: power, bonding (safety grounding) and lighting.
- Equipment: pump, filter and any upgrades you chose.
5. Backfill, inspection and first swim
The space around the pool is filled and leveled, and the work is inspected. After the final inspection we hand the pool over to you.
How long does it take?
From contract to first swim, a full installation usually takes about 90 business days. Most of that time is waiting for the permit. Once work starts in your yard, it moves faster than a concrete pool because the pool is already built.
What you can do to prepare
- Tell us about gates, fences, trees and overhead lines. Access to your yard affects how the pool is delivered.
- Think about what you want around the pool: a paver deck, a screen enclosure, a fence or a spa. We can plan these with the pool.
- Ask us about the free design of your backyard. After the site visit you can see the pool in your yard before we start.